Repairs to the Île-aux-Tourtes Bridge continue


PHOTO BY BLANCHARDB

The Québec Transport Ministry is informing road users that it will begin a new phase in its ongoing repairs of the Île-aux-Tourtes Bridge on Highway 40 from June 26, 2017, until winter 2018. The interventions concern the repair of beams in the westbound direction. Dynamic traffic management based on peak hours will be implemented using a removable barrier to limit the traffic impact.

Traffic Management - June 26, 2017 to winter 2018

Westbound (towards Vaudreuil-Dorion)

• 3 lanes will be open between 2 and 7 p.m. on weekdays

• 2 lanes open outside this time period

• Trucks are forbidden in the left lane

Eastbound (towards Montreal)

• 3 lanes open from 9 p.m. until noon

• 2 lanes open outside this period

Note that the speed limit on the bridge will be reduced to 70 km/h.

In the event of unfavorable weather conditions or operational constraints, the start of work in the west direction could be postponed.

Featured Posts
Recent Posts
Archive
Search By Tags
Follow Us
  • Facebook Basic Square
  • Instagram Social Icon
Archives
Sections
Current Issue
ylj-2018-transparent.png

Sports

  • Facebook App Icon
  • Twitter App Icon
  • 2016_instagram_logo

             © 2020 The Journal.